Heat numbers and mill test certificates: reading the paperwork properly
What a heat number identifies, what a mill test certificate to EN 10204 3.1 must contain, how to spot a weak certificate, and how to keep traceability intact from melt to installed asset.

What a heat actually is
A heat, or cast, is the batch of metal produced from one melting operation. Every component made from that melt shares the same heat number and the same chemical analysis. Mechanical properties, however, depend on the product form and the heat treatment applied afterwards, which is why a certificate must quote both the heat analysis and the results for the delivered condition.
What the certificate must contain
| Item | Why it matters |
|---|---|
| Heat number | The traceability link |
| Specification and UNS or grade | Confirms what was ordered |
| Heat analysis, actual values | Not ranges; actual measured chemistry |
| Mechanical test results | Yield, tensile, elongation, hardness where specified |
| Heat treatment description | Confirms the condition supplied |
| Dimensions and quantity | Confirms what was shipped |
| NDT results | Confirms the agreed examination scope |
| Signature or authorised stamp | Confirms validity |
Warning signs on a certificate
- Ranges instead of actual values. A certificate that quotes specification limits rather than measured results provides no evidence.
- No heat treatment description. The condition is often the most consequential variable in an alloy order.
- Missing heat number. Without it, nothing can be traced.
- No link to the component. The number on the certificate must match the number marked on the part.
- Certificate scope broader than the item. Check that the certificate actually covers the delivered size and form.
When independent verification is needed
Where the owner, EPC or regulator requires independent verification, inspection, sampling and laboratory testing by SGS can be arranged, and the resulting third party test report is issued with the shipment. This complements rather than replaces the mill certificate, and it is normally required for critical service, for large projects and for public sector procurement.
Questions about this topic
What is the difference between a heat number and a batch number?
Is EN 10204 3.1 enough for critical service?
What should I do if the marking is lost during fabrication?
Questions about our products
What products does Hangbo Alloy supply?
Which alloy grades are available for these products?
What sizes, wall thicknesses and pressure classes can you supply?
Which material and dimensional standards do you work to?
Is there a minimum order quantity?
What inspection and certification is issued with the goods?
What are typical lead times?
How are the products packed for export?
How do I request a quotation or a sample?
Talk to an engineer
Share your duty conditions and we will shortlist candidate alloys within one working day.